School ReBuild – Aluminium Windows & Doors to the Rescue

front coverComar Architectural Aluminium Systems, with their approved fabricator Anglia Fixing Ltd; completed an extended rebuild of John Ray Infants School which was burnt  to the ground during a 12 hour fire, days before the pupils returned from summer holidays.  This extended new build project has enabled the school to increase its intake from 285 to 360 pupils providing much needed extra school places in the local community.

This project was completed using Comar 5P.i ECO Top Hung  Windows.  The aluminium P.i & P.i ECO window and door systems use trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance and reduces heat loss through the thermal break ensuring low U-values and therefore ensuring energy bills are minimised.

Comar 7P.i Commercial Doors are a natural choice in a busy school environment and were selected for the main entrance and external doors.  The doors and windows were hung directly into the Comar 9P.i Framing system which was also used to install a large glazed area to the schools front facade.

TM52R002_M4 - CopyTM52R002_M15 - Copyback resize

Architects: Fielder & Mawson

Fabricator: Anglia Fixing Ltd

Main Contractor: Morgan Sindall PLC

System Used: Comar   5P.i ECO (Top Hung), 9P.i Framing & 7P.i CD

Location: Braintree, Essex