School ReBuild – Aluminium Windows & Doors to the Rescue

front coverComar Architectural Aluminium Systems, with their approved fabricator Anglia Fixing Ltd; completed an extended rebuild of John Ray Infants School which was burnt  to the ground during a 12 hour fire, days before the pupils returned from summer holidays.  This extended new build project has enabled the school to increase its intake from 285 to 360 pupils providing much needed extra school places in the local community.

This project was completed using Comar 5P.i ECO Top Hung  Windows.  The aluminium P.i & P.i ECO window and door systems use trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance and reduces heat loss through the thermal break ensuring low U-values and therefore ensuring energy bills are minimised.

Comar 7P.i Commercial Doors are a natural choice in a busy school environment and were selected for the main entrance and external doors.  The doors and windows were hung directly into the Comar 9P.i Framing system which was also used to install a large glazed area to the schools front facade.

TM52R002_M4 - CopyTM52R002_M15 - Copyback resize

Architects: Fielder & Mawson

Fabricator: Anglia Fixing Ltd

Main Contractor: Morgan Sindall PLC

System Used: Comar   5P.i ECO (Top Hung), 9P.i Framing & 7P.i CD

Location: Braintree, Essex

 

New Territory Manager – East Anglia

Comar are delighted to announce Matt Thetford has joined us Territory Manager.  Matt will be covering the following areas:

  • Essex (Outside M25)
  • Cambridgeshire
  • Norfolk
  • Suffolk
  • Bedfordshire
  • Rutland
  • Hertfordshire

Contact Matt at mattt@parksidegroup.co.ukweymouth fire station@parksidegroup.co.uk

New Library & Supported Living for Local Community

seaford

Comar Architectural Aluminium Systems, with their approved fabricator Veranti Systems; recently completed the new Seaford Library complex in East Sussex.  This multi million pound project is part of the Sutton Park Road development for East Sussex County Council and Saxon Weald Homes and includes a library, cafe, supported living for adults with learning disabilities and adult day services for older people.

Copy of image001 Copy of image004

This mixed use project was completed using Comar 5P.i Tilt & Turn windows, Comar 6EFT Curtain Walling, Comar 7 Folding Sliding Doors and Comar 7P.i CD doors in both Pivot and Sliding configurations.  Comar 5Pi window system uses trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance in a market where energy efficient designs and meeting the demands of the latest building regulations are paramount.  From fifteen basic Comar 5Pi profiles, all window configurations, such as casement, top swing reversible, pivot, tilt and turn and sliding can be manufactured.

The architect’s design vision was to create a continuous wall of glass to the libraries ground floor facade. With this in mind, and to ensure the design brief could be achieved, Comar 6EFT was selected as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.

In a mixed use development both Comar 7 and Comar 7P.i CD systems are a natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically to be suitable for public and domestic applications.  The entrance doors to the library were also required to comply with the Disability & Equality Act 2010.

 

School Achieves Excellent BREEAM Rating & Shortlisted for ‘Construction Award’ 2015

SAMSUNG CAMERA PICTURES

Comar Architectural Aluminium Systems; with their approved fabricator Veranti Systems completed a new build 2 form entry Catholic Primary School in Poplar, East London. Formed out of a merger of two schools the bright and eye catching design uses brick to match the surrounding area and is wrapped with shards of colour in the form of Brise Soleil. The overhanging roof ensures extra shading; with the roof line being reminiscent of Poplar’s ship building past and the skyline of London’s Canary Wharf featuring as the backdrop.  Achieving a BREEAM rating of excellent the school has been shortlisted for a 2015 ‘Construction Award’.

Comar 5P.i. Top/ Side Hung and Fixed Light  thermally efficient polyamide insulated windows were specified. These aluminium windows offer outstanding weather performance and reduce heat loss through the trademark P.i thermal break ensuring low U-values so energy bills are minimised.

SAMSUNG CAMERA PICTURES  SAMSUNG CAMERA PICTURESSAMSUNG CAMERA PICTURES

Comar 6 curtain walling is a versatile thermally efficient system designed to integrate panels and glass of different widths into the façade with special profiles to include opening vents and doors.  The design of Comar 6 makes it ideal for complex facetted curtain walls as well as sheer glazed facades. Comar 6 was selected due to its slim 50mm profiles which maximised the glazed area for natural day lighting.

In a busy education environment, Comar 7 sets are a natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically for applications where high traffic solutions are required.  For safety, the Comar 7 doors were fitted with anti-finger trap stiles, Axim soft touch panic exit devices and Axim concealed transom closers which were hung directly from the Comar 6 frame and complied with the Disability & Equality Act 2010.

Architects: Green Tea Architects, SE London

Fabricator:  Veranti Systems, Hampshire

Main Contractor: 8 Build, London

System Used: Comar:  5P.i, 6, 7P.i CD & Ducosun Cubic 200/ 300

 

 

Comar Juxtaposition – Manchester

Ashton 6th Form College’s new reception was designed by the GA Studio, Manchester and is a featured  project in the 2015 Manchester Architectural Review.  Both Comar 6 EFT Curtain Walling and Comar 7 Auto Sliding Doors were specified for this eye catching project.

http://www.excelpublishing.co.uk/directories/Manchester-Architects/2015/#/1/

Building Awards 2015 – Sponsorship

Comar are the proud sponsors of the Architectural Practice of the Year Award.

The Building Awards take place on 22nd April 2015 at the Grosvenor House Hotel, London.

Best of luck to all the nominees.

Structural Curtain Wall Facade for Southend Airport

Comar Architectural Aluminium  Systems; with their approved fabricator L.A.G (Lincolnshire Architectural Glazing) completed works on the first phase of London’s newest airport terminal at Southend Airport. Since opening the airport saw a 29.9% passenger increase during the summer of 2013, their busiest summer since formal records began in 1967.

LAportfolio image frontportfolio bottom pic

The design vision was to create a continuous glazed facade to the new terminal clearly identifying its location to passengers. With this in mind, and to ensure the design brief could be achieved, Comar 6EFT 4sided SG was selected as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.  Comar 6EFT 4sided SG also offered the slimmest silicon or EPDM joints in the industry, which means the eye catching glazed area is maximised.

In an extremely busy Airport environment, Comar 7P.i Commercial Door sets were the natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically for applications where high traffic solutions are required.  Polyamide Insulated (P.i) door systems also provide exceptional thermal performance in a market where energy efficient designs and meeting the demands of the latest building regulations are paramount.

All Comar approved fabricators are required to have the technical expertise to attend pre-site meetings and provide detailing.  L.A.G liaised closely with the specifiers to provide design advice and detailing which ensured the project ran smoothly and met site deadlines.