Comar Launch SBD Licenced Commercial Door

New Comar 7P.i CDE Commercial Door Electronic Lock with Access Control Integration Secured by Design Licenced Product

Comar 7P.i Commercial Door

Comar Architectural Aluminium Systems, part of TPG – The Parkside Group Limited, announce the launch of Comar 7P.i CDE, a Commercial Swing Door with Electronic Locking, that now holds a Secured By Design Licence. The Comar 7P.i CDE is an electronic lock option for the thermally broken commercial swing door range, which offers access control integration for both single and double leaf door sets. Secured by Design Homes 2016 requires that occupants, of a residential building with 10 or more distinct dwellings, must be able to remotely control the main entrance door from their apartment to allow access to known visitors.  The Comar 7P.i CDE is ideal for multi-dwelling apartment applications, where the electronic lock suites in with most access control panels and includes panic exit hardware options.  The solution can also be used in all matter of public buildings where occupant safety is required, such as Health, Education and other Public Buildings.

Comar specifiers and fabricators can be reassured by Comar 7P.i CDE’s secure, flexible design options. Achieving PAS 24:2016 in double leaf swing doors is particularly challenging to pass on a test, as the doors resist a 4.5kN loading as well as a manual attack tests.   Double leaf doors are often called for on residential buildings as they allow facilities teams and occupants ease of access for bulky objects such as furniture, yet still provide uncompromised security and convenience for day to day access where only a single leaf is commonly used, the Comar 7P.i CDE provides this solution.

Comar 7P.i CDE has been added to Comar’s BSi’s Kitemark for Enhanced Security which incorporates testing to BS 6375 Parts 1, 2 and 3, for a high traffic entrance door this means that the Comar 7Pi CDE has been tested and certified to 50,000 open and closing cycles, which is a requirement of the Secured by Design License.

Comar 7P.i CD Commercial Door

The Comar 7P.i CDE lock uses magnetic triggers, located in the keeps, tripping the sprung loaded locking points, which snap ‘locked’ almost instantly when the door is closed. This provides a ‘fail locked’ environment that immediately protects a vulnerable resident returning home, even in the event of a power failure or vandalism.

Not only does the Comar 7P.i CDE integrate with access control systems, it also has been tested with the Fuhr’s Panic Exit crash bar, helping designers meet fire safety demands while providing PAS 24:2016 level of security and high traffic resilience.  Comar’s lever door handles also integrate with the lock, their operation manually reloading the sprung mechanical locking points.  Together with the magnet triggered instant locking, which helps prevent criminals following occupants into their building, the Comar 7P.i CDE offers unparalleled functionality.

Comar 7P.i CDE has a comprehensive range of accessories, available direct from Comar, including a remote-control key fob, a wireless push pad and hard-wired switches.

The Comar 7P.i CDE also presents advantages in fabrication, including the need for only four machined ‘pockets’ in the lock and keep stiles, plus a one piece lock, thereby speeding up assembly times and reducing workshop errors. A single cable provides the lock with power and signal simplifying the routing in the frames. To cater for structural tolerances on site, adjustable raised keeps are available to ensure the locks engage correctly.

Education Project

Commercial Door

The Comar 7P.i CDE door solution is available today via our Secured by Design Group Scheme of approved fabricators. Our Project Managers will help designers best specify the most appropriate options for their projects, while our highly responsive Technical Support Team are always on hand to give in detail support.

Contact us on 020 8685 9685, email projects@parksidegroup.co.uk or visit www.comar-alu.co.uk

Aluminium Specified for Innovation Hub

Comar in conjunction with their approved fabricator Tradeglaze provided and installed the Aluminium solutions for the new KLIC Innovation Centre, Nar Ouse Regeneration area based in Kings Lynn, Norfolk.

klic_009

The 22,000sq ft centre is owned by Nwes the leading enterprise agency and delivers long awaited state-of-the-art commercial work space for the West Norfolk area. This £5 million centre was made possible with £2.5 million of funding from New Anglia Local Enterprise Partnerships – Growing Places Fund and £1,150,000 million from the local Borough Council.klic_023

klic_028-copy

Comar systems installed on this project were: 6EFT Curtain Walling, Comar 9P.i Fixed Lights with Comar 7P.i Commercial Doors installed for the external entrances.

Architect: Fielden & Mawson

Contractor: R G Carter, Kings Lynn

Fabricator: Tradeglaze

Aluminium Solution -Tall Buildings for Students

 Chamberlain Student Accommodation

The University of Birmingham’s new Chamberlain Hall Student Accommodation is an impressive example of regeneration which is in keeping with the landscape as well as providing all essential capacity growth for the future.  Consisting of 2 linked tall towers at 17 at & 21 stories and 5 “finger” blocks.

uob-ch-073comar-chamberlainuob-ch-070

With the modern financial implications of studying and attracting international students, accommodation needs are changing.  The University of Birmingham now has a building which gives good quality architecture and a landmark to Birmingham’s skyline that advertises the quality of the institute to perspective students and their parents.

Feasibility studies indicated that to increasing the density could not be achieved with the existing floor-plan therefore a new building was commissioned.  The design concept was to maintain the links to the previous building tower yet create a design that was modern, light; creating a place where students would wacomar-chamberlain-tower-blocknt to live, socialise and study.

The Façade concept was to ensures that the palette of colours is sympathetic to the landscape, using rich coppers, and an intelligent use of brickwork the building merges into the landscape and maintains cross corridor views to the lake.

The façade had to provide function as well as form.  Day-lighting is vital to aid with studying, no dark gloomy corners, a light and airy interior is desirable.   Natural ventilation was a must, however, in keeping with the structured façade open-in windows were required fronted with ventilation panels, to allow ventilation yet not impact on the façades integrity, maintaining the clean lines and sleek elevations.

Making the façade work and integrate with all the cladding elements involved Comar Architectural Aluminium Systems designing new methods of fixing.  The flush façade was a must and all the elements: Comar Glazing, Mesh and Copper panels needed to integrate.

comar-chamberlain-close-up

One of the engineering challenges on the project was the connection of the perforated copper cladding panels to the Comar 6EFT curtain walling.  This connection had a few considerations, such as the metals being at opposite ends of the galvanic table, aesthetic demands, thermal performance and the structural considerations of loading panels to Comar 6EFT curtain walling.

Continental Installations worked closely with Comar Architectural Aluminium Systems and main contractor Balfour Beatty on the complex façade.  The team designed a bespoke capping profile which was extruded with re-enforced walls capable of fixing the copper panels directly to it.  A heavy duty pressure plateuob-ch-022 with a fixing port arrangement, was used to mechanically fix the capping to the pressure plate.  Subsequent regular fixings then transmitted the applied loads back to the rear structural mullion member to ensure there was no thermal bridging.  All connections were fully isolated to prevent bi-metallic corrosion.

This bespoke design then included inward full height opening windows which sat behind the façade, Comar 5P.i Advanced Tilt/Turn open in windows were selected.  These windows were perfect for the application as they offer slim sight-lines, thus maximising daylighting as well as the profiles themselves have thicker walls that provide robustness and large spans to ensure they stand the test of time.

On the window elements Comar 5P.i Advanced Tilt/Turn open in windows were selected.  These tilt/turn windows are perfect for the application, they offer slim sight-lines to maximise day-lights as well as the profiles themselves have wide wall thicknesses that provide robustness to ensure they stand the test of time.  The wire mesh fitted directly onto the window.

The five finger blocks were sited to draw people through the buildings and connect with the landscape beyond.  Full height windows were selected, again, from the Comar 5P.i Advanced Tilt/Turn range.   uob-ch-037Fritted glass was used to the bottom of the glazing, allowing light, but prevents items below the desk being seen from the outside.  The use of bay windows provide a feature to the buildings facade and views of the landscape for occupants.  At upper levels again to maximise views, study bedrooms have splayed bay windows, a feature in the original 1960s Mason Hall.

 

Systems Used: Comar 6EFT Curtain Walling, Comar 5P.i Advanced Tilt & Turn Windows & Comar 7P.i CD Doors 

Project Value: Part of £42 Million Redevelopment

Photographer: John Kees Photography

 

School ReBuild – Aluminium Windows & Doors to the Rescue

front coverComar Architectural Aluminium Systems, with their approved fabricator Anglia Fixing Ltd; completed an extended rebuild of John Ray Infants School which was burnt  to the ground during a 12 hour fire, days before the pupils returned from summer holidays.  This extended new build project has enabled the school to increase its intake from 285 to 360 pupils providing much needed extra school places in the local community.

This project was completed using Comar 5P.i ECO Top Hung  Windows.  The aluminium P.i & P.i ECO window and door systems use trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance and reduces heat loss through the thermal break ensuring low U-values and therefore ensuring energy bills are minimised.

Comar 7P.i Commercial Doors are a natural choice in a busy school environment and were selected for the main entrance and external doors.  The doors and windows were hung directly into the Comar 9P.i Framing system which was also used to install a large glazed area to the schools front facade.

TM52R002_M4 - CopyTM52R002_M15 - Copyback resize

Architects: Fielder & Mawson

Fabricator: Anglia Fixing Ltd

Main Contractor: Morgan Sindall PLC

System Used: Comar   5P.i ECO (Top Hung), 9P.i Framing & 7P.i CD

Location: Braintree, Essex

 

New Library & Supported Living for Local Community

seaford

Comar Architectural Aluminium Systems, with their approved fabricator Veranti Systems; recently completed the new Seaford Library complex in East Sussex.  This multi million pound project is part of the Sutton Park Road development for East Sussex County Council and Saxon Weald Homes and includes a library, cafe, supported living for adults with learning disabilities and adult day services for older people.

Copy of image001 Copy of image004

This mixed use project was completed using Comar 5P.i Tilt & Turn windows, Comar 6EFT Curtain Walling, Comar 7 Folding Sliding Doors and Comar 7P.i CD doors in both Pivot and Sliding configurations.  Comar 5Pi window system uses trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance in a market where energy efficient designs and meeting the demands of the latest building regulations are paramount.  From fifteen basic Comar 5Pi profiles, all window configurations, such as casement, top swing reversible, pivot, tilt and turn and sliding can be manufactured.

The architect’s design vision was to create a continuous wall of glass to the libraries ground floor facade. With this in mind, and to ensure the design brief could be achieved, Comar 6EFT was selected as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.

In a mixed use development both Comar 7 and Comar 7P.i CD systems are a natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically to be suitable for public and domestic applications.  The entrance doors to the library were also required to comply with the Disability & Equality Act 2010.

 

Comar Aluminium Complete New Student Accomodation

Comar Architectural Aluminium Systems, with their approved fabricator Barking Shopfronts; recently completed a change of use building refurbishment on Grove House, Ealing, London.  Situated between Ealing High Street and the  Ealing Green Conservation Area,  this building was a 1980’s unused former teaching facility, forming part of the University of West London, has now been transformed into 100 self contained studios for students. Barking Shopfronts were able to ensure that this project could be completed within the restraints of the budget.

Grove House Ealing CGI - Copy

This building conversion was completed using Comar 5P.i Tilt & Turn and fixed light windows, Comar 6EFT curtain walling to the main entrances and stairways, Comar 7P.i Doors for the entrances with Comar 9P.i Framing used for the side lights.

Comar 6EFT 4sided SG provides a structurally glazed solution with EPDM or Silicon seals, 6EFT offers architects the opportunity to maximise a glazed area as it has the slimmest seals on the market enabling as much natural daylight as possible into the staircases. 

grove house fgrove house a dgrove house a c

In a busy residential and particularly high traffic student environment, Comar 7P.i Commercial Door sets are a natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically for public applications.  All aluminium was powder coated to a Grey RAL 7037 Matt finish.

Architects: Aros Architects
Fabricator: Barking Shopfronts Ltd
Main Contractor: Bennett Construction
Project Value:  £360K
System Used:  Comar 5P.i, 6EFT, 7P.i, 9P.i
Location: Ealing, London