Aluminium Specified For Regeneration Project

Comar Architectural Aluminium Systems, with their approved fabricator LDG (Lancashire Double Glazing) completed the installation of aluminium curtain walling, windows and commercial doors to a new waterfront £8.6million flagship office block and call centre. Part of the Mersey Waters Enterprise Zone and the 500 acre Wirral Waters regeneration scheme, and built on previously derelict land, The Tower Wharf project saw the design of the 48,000 sq ft 4 storey office building which includes a roof terrace and office accommodation for around 800 staff.  This project was also the Winner of Best Commercial Building at the ‘RICS’ 2016 Awards and the building achieved the BREEAM ‘Excellent’ rating for sustainability.

To maximise natural daylight and facilitate the large glazed areas Comar 6EFT was specified as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.  Comar 6EFT also offers the slimmest silicon or EPDM joints in the industry, which means the eye catching glazed area is maximised. LDG could ensure that this project could be completed within the restraints of the budget. Complying with the latest CWCT standards Comar 6EFT systems are mullion drained thermally broken structurally glazed curtain walling system with drained capping, pressure equalised and drained is in accordance with BS6262.

In a market where energy efficient designs and meeting the demands of the latest Building Regulations are paramount Comar 5P.i Auto Opening Vent, thermally efficient polyamide insulated windows were specified. These aluminium windows offer outstanding weather performance and reduce heat loss through the trademark P.i thermal break ensuring low U-values so energy bills are minimised.

Comar 7P.i Commercial Door sets were the natural choice for this high traffic head office/call centre building. Comar 7P.i CD door sets can be hung from Comar 6EFT framing and are a natural choice for any busy environment.  They are available in swing, pivot, sliding, auto-sliding and sliding folding options.

Architects: Falconer Chester Hall

Fabricator: LDG (Lancashire Double Glazing)

Main Contractor: Eric Wright Construction

Project Value: £1m

Systems Used:  Comar 6EFT Toggle, 5P.i  60mm Auto Opening Vents, 7P.i CD

 

New BDM for London & SE

Comar are delighted to welcome Tom Cahill as Business Development Manager for London & SE areas.

Contact Tom at: tomcahill@parksidegroup.co.uk

www.comar-alu.co.uk

BES 6001:3.1 Certification Awarded

The impact of our purchasing decisions has never been more critical.  Our global economy is now bringing to bear the Butterfly effect: when a butterfly flaps it’s wings in one part of the world it can cause a hurricane in another part of the world.  Construction by its nature of increasing or improving density is intensely energy demanding, the embodied energy contained in our building stock has derived from the earth’s resources, therefore, as construction professionals we should all carefully consider the ethics of our purchasing decisions.  The materials used on a building draw from the Global economy, therefore a decision today could create deforestation in poorer regions of the world or create the impetus for modern slavery.

comar-narrow-lane-farm-1

Comar Architectural Aluminium Systems, as a British privately owned organisation has always held its integrity in business as the cornerstone of its operations.  As part of The Parkside Group Limited, Comar has built up excellent, long term relationships with its suppliers, ensuring they are paid on time and if issues arose building partnerships which quickly lead to their resolution.

We require as a minimum that they have an ethical business and hold ISO 14001 certification.  Good supplier management coupled with ethical business practices is the basis of BRE’s BES 6001 standard for the Responsible Sourcing of Construction Products.

We are pleased to announce that we are certified through BRE’s new BES 6001:3.01 Responsible Sourcing of Construction Products, receiving a “Good” rating.  This ensures that our architectural and contractor partners can rest assured, that in contracting with Comar and its Nationwide Network of Approved Subcontractors our aluminium windows, doors and curtain walling systems have been sourced responsibly with a company that holds the ethics of good supplier management at its heart.  Not only does BES 6001 audit and accredit supplier management it delves deeper to ensure that all aspects of global citizenship are covered, these are held under three main headings: Organisational Management, Supply Chain Management and Environmental and Social Responsibility Management.  This award is even more noteworthy when we consider that this is the new standard and Comar are the first to receive this in the aluminium sector.  Click to view certification http://blog.comar-alu.co.uk/wp-content/uploads/2016/11/BES-6001-3-1- Responsible-Sourcing-Certificate-2016-2019-Page-1-only.pdf

comar-tower-wharf-birkenhead

Recognising the importance of our Purchasing decisions and the impact they may have on our environment and society, we encourage our Supply Chain to implement a certified Quality, Environmental, and Health and Safety Management System. We also recognise the importance of Environmental Protection and we are committed to operating our business in compliance with all Environmental Regulations, Legislation and initiatives relating to the building industry and the wider Environment.

It is the organisation’s objective to operate with, and to maintain good relations with all regulatory bodies and places Environmental Protection at the core of its operations. The Parkside Group Limited is accredited to the Environmental Standard ISO 14001:2004 and is currently in transition to the new 2015 version.

The Parkside Group is committed to conducting its business in an open and honest manner and as such this our Corporate Social Responsibility (CSR) policy reflects the commitment of our employees to minimise the impact of our operations for future generations and ensuring the welfare of its staff and the local area. We pride ourselves with promoting all we do in an ethical and integral way. As part of our commitment to responsibly sourcing we continuously monitor the impact of our working practices and the design of our systems to ensure any environmental impact is minimised.

For our full CSR Statement please visit: www.comar-alu.co.uk/environmental

 

Aluminium Specified for Innovation Hub

Comar in conjunction with their approved fabricator Tradeglaze provided and installed the Aluminium solutions for the new KLIC Innovation Centre, Nar Ouse Regeneration area based in Kings Lynn, Norfolk.

klic_009

The 22,000sq ft centre is owned by Nwes the leading enterprise agency and delivers long awaited state-of-the-art commercial work space for the West Norfolk area. This £5 million centre was made possible with £2.5 million of funding from New Anglia Local Enterprise Partnerships – Growing Places Fund and £1,150,000 million from the local Borough Council.klic_023

klic_028-copy

Comar systems installed on this project were: 6EFT Curtain Walling, Comar 9P.i Fixed Lights with Comar 7P.i Commercial Doors installed for the external entrances.

Architect: Fielden & Mawson

Contractor: R G Carter, Kings Lynn

Fabricator: Tradeglaze

New Territory Manager – East Anglia

Comar are delighted to announce Matt Thetford has joined us Territory Manager.  Matt will be covering the following areas:

  • Essex (Outside M25)
  • Cambridgeshire
  • Norfolk
  • Suffolk
  • Bedfordshire
  • Rutland
  • Hertfordshire

Contact Matt at mattt@parksidegroup.co.ukweymouth fire station@parksidegroup.co.uk

Comar Aluminium Achieve Q-Mark

Comar are delighted to announce they have been accredited with BM Trada
Q-Mark certification for:

  • Window General Performance – BS 4873 Aluminium
  • Enhanced Security Window Scheme –
    PAS 24:2012 & BS 4873 Aluminium
  • Enhanced Security Door – PAS 24:2012
    & BS 4873 Aluminium

This now enables our fabricators to achieve Secured By Design compliance via the
BSi or the Q-Mark certification.

 Q marks with UKAS logos JUNE 20