Aluminium Specified For Regeneration Project

Comar Architectural Aluminium Systems, with their approved fabricator LDG (Lancashire Double Glazing) completed the installation of aluminium curtain walling, windows and commercial doors to a new waterfront £8.6million flagship office block and call centre. Part of the Mersey Waters Enterprise Zone and the 500 acre Wirral Waters regeneration scheme, and built on previously derelict land, The Tower Wharf project saw the design of the 48,000 sq ft 4 storey office building which includes a roof terrace and office accommodation for around 800 staff.  This project was also the Winner of Best Commercial Building at the ‘RICS’ 2016 Awards and the building achieved the BREEAM ‘Excellent’ rating for sustainability.

To maximise natural daylight and facilitate the large glazed areas Comar 6EFT was specified as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.  Comar 6EFT also offers the slimmest silicon or EPDM joints in the industry, which means the eye catching glazed area is maximised. LDG could ensure that this project could be completed within the restraints of the budget. Complying with the latest CWCT standards Comar 6EFT systems are mullion drained thermally broken structurally glazed curtain walling system with drained capping, pressure equalised and drained is in accordance with BS6262.

In a market where energy efficient designs and meeting the demands of the latest Building Regulations are paramount Comar 5P.i Auto Opening Vent, thermally efficient polyamide insulated windows were specified. These aluminium windows offer outstanding weather performance and reduce heat loss through the trademark P.i thermal break ensuring low U-values so energy bills are minimised.

Comar 7P.i Commercial Door sets were the natural choice for this high traffic head office/call centre building. Comar 7P.i CD door sets can be hung from Comar 6EFT framing and are a natural choice for any busy environment.  They are available in swing, pivot, sliding, auto-sliding and sliding folding options.

Architects: Falconer Chester Hall

Fabricator: LDG (Lancashire Double Glazing)

Main Contractor: Eric Wright Construction

Project Value: £1m

Systems Used:  Comar 6EFT Toggle, 5P.i  60mm Auto Opening Vents, 7P.i CD

 

New BDM for London & SE

Comar are delighted to welcome Tom Cahill as Business Development Manager for London & SE areas.

Contact Tom at: tomcahill@parksidegroup.co.uk

www.comar-alu.co.uk

Aluminium Facade for New Hotel

park-regis-comar-resize

International hotelier Park Regis have opened their first European hotel in Britain’s second city Birmingham.  Towering over the skyline at 16 storeys the £50 million pound hotel offers 254 rooms, a gym, various bars, business and conference centres and a 2 storey glazed terrace sky bar delivering high end dining to Birmingham. comar-park-regis-atrium-copy comar-park-regis-rofuto-sky-bar-copy

Comar Architectural Aluminium Systems were selected to provide the façade with curtain walling, windows and entrances.  The key element of design for the Rofuto Sky Bar was to allow diners to enjoy clear uninterrupted views across the city, a double height Comar 6EFT Curtain wall was selected as it offers strength with a sleek 50mm sight-line.  This ground breaking system, leads the way by offering a 50mm stick system with the capability to span further as the mullions and transoms have the highest Ix and Iy values on the market today.  The design is also in keeping with the hotels minimalist Japanese Interior which echoes the “Byoba” art of Japanese screens.  The curtain wall grid was off-set with symmetrically staggered mullions and transoms which create the typical lattice effect found in Japanese interiors.

comar-park-regis-tall-building-resize-copy

The profiles where finished in RAL 7016 Matt Grey  which seamlessly blends into the mahogany, cream and gold interior.  All structural calculations were carried out by Comar’s Special Projects Team who ensured all Comar bracketry and fixings will withstand any sway, dead or live loads.

The cladding to the façade below the Rofuto Sky Bar was a palette of Ruukki panels, polished stone rain screen, and Kingspan Benchmark, A.  Comar’s interface range of adaptors allowed the Comar 5Pi Advanced Windows to seamlessly integrate with the differing cladding elements.  The design detailing of all these elements ensured that the façade had no thermal bridging and will maintain it’s air and water-tight solution.

Moving to the base of the building, Comar 6EFT capped curtain walling was used.  Comar 6EFT interfaces with the dramatic angled cantilevered entrances.  For this element of the face design the detailing and installation had to be precise to ensure that drainage and seals create a future-proof water tight solution.

Integrated into the curtain wall the entrances have to provide both a statement of welcome and ensure uninterrupted access.  Often the first experience of a hotel is the entrance, which needs to provide form as well as function.  The Comar 7P.i Commercial Door system is one of the most comprehensive on the market today.  Sections are robust and offer an ideal solution for high traffic entrances.  The doors selected were auto sliding which allow uninterrupted passage into the double storey entrance lobby.

comar-park-regis-birmingham-resize

APiC, a Comar Approved Fabricator were involved throughout the specification stage with both Comar and the Architect.  APiC also worked closely with the Contractor to ensure that the project programme was met to ensure the time critical opening of March 2016 was achieved.  Steve Tycer Managing Director of APiC UK, said.  “We enjoy working with Comar as I know we can reassure our clients that site deadlines will be met.  Comar’s Market Leading delivery is a key factor when we are up against a tight programme.“

Developer: Colmore Tang Construction
Architect: BDG (Building Design Group) Tamworth

 

Aluminium Specified for Innovation Hub

Comar in conjunction with their approved fabricator Tradeglaze provided and installed the Aluminium solutions for the new KLIC Innovation Centre, Nar Ouse Regeneration area based in Kings Lynn, Norfolk.

klic_009

The 22,000sq ft centre is owned by Nwes the leading enterprise agency and delivers long awaited state-of-the-art commercial work space for the West Norfolk area. This £5 million centre was made possible with £2.5 million of funding from New Anglia Local Enterprise Partnerships – Growing Places Fund and £1,150,000 million from the local Borough Council.klic_023

klic_028-copy

Comar systems installed on this project were: 6EFT Curtain Walling, Comar 9P.i Fixed Lights with Comar 7P.i Commercial Doors installed for the external entrances.

Architect: Fielden & Mawson

Contractor: R G Carter, Kings Lynn

Fabricator: Tradeglaze

Aluminium Solution -Tall Buildings for Students

 Chamberlain Student Accommodation

The University of Birmingham’s new Chamberlain Hall Student Accommodation is an impressive example of regeneration which is in keeping with the landscape as well as providing all essential capacity growth for the future.  Consisting of 2 linked tall towers at 17 at & 21 stories and 5 “finger” blocks.

uob-ch-073comar-chamberlainuob-ch-070

With the modern financial implications of studying and attracting international students, accommodation needs are changing.  The University of Birmingham now has a building which gives good quality architecture and a landmark to Birmingham’s skyline that advertises the quality of the institute to perspective students and their parents.

Feasibility studies indicated that to increasing the density could not be achieved with the existing floor-plan therefore a new building was commissioned.  The design concept was to maintain the links to the previous building tower yet create a design that was modern, light; creating a place where students would wacomar-chamberlain-tower-blocknt to live, socialise and study.

The Façade concept was to ensures that the palette of colours is sympathetic to the landscape, using rich coppers, and an intelligent use of brickwork the building merges into the landscape and maintains cross corridor views to the lake.

The façade had to provide function as well as form.  Day-lighting is vital to aid with studying, no dark gloomy corners, a light and airy interior is desirable.   Natural ventilation was a must, however, in keeping with the structured façade open-in windows were required fronted with ventilation panels, to allow ventilation yet not impact on the façades integrity, maintaining the clean lines and sleek elevations.

Making the façade work and integrate with all the cladding elements involved Comar Architectural Aluminium Systems designing new methods of fixing.  The flush façade was a must and all the elements: Comar Glazing, Mesh and Copper panels needed to integrate.

comar-chamberlain-close-up

One of the engineering challenges on the project was the connection of the perforated copper cladding panels to the Comar 6EFT curtain walling.  This connection had a few considerations, such as the metals being at opposite ends of the galvanic table, aesthetic demands, thermal performance and the structural considerations of loading panels to Comar 6EFT curtain walling.

Continental Installations worked closely with Comar Architectural Aluminium Systems and main contractor Balfour Beatty on the complex façade.  The team designed a bespoke capping profile which was extruded with re-enforced walls capable of fixing the copper panels directly to it.  A heavy duty pressure plateuob-ch-022 with a fixing port arrangement, was used to mechanically fix the capping to the pressure plate.  Subsequent regular fixings then transmitted the applied loads back to the rear structural mullion member to ensure there was no thermal bridging.  All connections were fully isolated to prevent bi-metallic corrosion.

This bespoke design then included inward full height opening windows which sat behind the façade, Comar 5P.i Advanced Tilt/Turn open in windows were selected.  These windows were perfect for the application as they offer slim sight-lines, thus maximising daylighting as well as the profiles themselves have thicker walls that provide robustness and large spans to ensure they stand the test of time.

On the window elements Comar 5P.i Advanced Tilt/Turn open in windows were selected.  These tilt/turn windows are perfect for the application, they offer slim sight-lines to maximise day-lights as well as the profiles themselves have wide wall thicknesses that provide robustness to ensure they stand the test of time.  The wire mesh fitted directly onto the window.

The five finger blocks were sited to draw people through the buildings and connect with the landscape beyond.  Full height windows were selected, again, from the Comar 5P.i Advanced Tilt/Turn range.   uob-ch-037Fritted glass was used to the bottom of the glazing, allowing light, but prevents items below the desk being seen from the outside.  The use of bay windows provide a feature to the buildings facade and views of the landscape for occupants.  At upper levels again to maximise views, study bedrooms have splayed bay windows, a feature in the original 1960s Mason Hall.

 

Systems Used: Comar 6EFT Curtain Walling, Comar 5P.i Advanced Tilt & Turn Windows & Comar 7P.i CD Doors 

Project Value: Part of £42 Million Redevelopment

Photographer: John Kees Photography

 

School ReBuild – Aluminium Windows & Doors to the Rescue

front coverComar Architectural Aluminium Systems, with their approved fabricator Anglia Fixing Ltd; completed an extended rebuild of John Ray Infants School which was burnt  to the ground during a 12 hour fire, days before the pupils returned from summer holidays.  This extended new build project has enabled the school to increase its intake from 285 to 360 pupils providing much needed extra school places in the local community.

This project was completed using Comar 5P.i ECO Top Hung  Windows.  The aluminium P.i & P.i ECO window and door systems use trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance and reduces heat loss through the thermal break ensuring low U-values and therefore ensuring energy bills are minimised.

Comar 7P.i Commercial Doors are a natural choice in a busy school environment and were selected for the main entrance and external doors.  The doors and windows were hung directly into the Comar 9P.i Framing system which was also used to install a large glazed area to the schools front facade.

TM52R002_M4 - CopyTM52R002_M15 - Copyback resize

Architects: Fielder & Mawson

Fabricator: Anglia Fixing Ltd

Main Contractor: Morgan Sindall PLC

System Used: Comar   5P.i ECO (Top Hung), 9P.i Framing & 7P.i CD

Location: Braintree, Essex

 

Aluminium Windows & Doors for Warehouse & Offices

Comar Architectural Aluminium Systems; with their approved fabricator Anglia Fixing Ltd completed a new build office and warehousing unit for British Gaskets in Sudbury, Suffolk.

Comar 5P.i ECO top hung casement windows were specified. These windows offer outstanding weather performance and reduce heat loss through the trademark P.i thermal break ensuring low U-values and keeping energy bills to a minimum. Comar 5P.i ECO is a casement window system which includes a 55mm and 75mm option.

Anglia Fixing were able to ensure that this project could be completed within the restraints of the budget and that Comar 6EFT Curtain Walling system complied with the latest CWCT standards.  Comar 6EFT mullion drained, thermally broken, stick construction curtain walling with drained capping and pressure equalised was installed to create the large glazed areas to the front and side of the building, enabling as much natural daylight as possible to the main staircase.

 

WKP-MSAP-British Gaskets-9306 - Copy WKP-MSAP-British Gaskets-9296

Comar 7P.i Commercial Door sets were the natural choice for this busy office project.  For safety, the Comar 7P.i Commercial Doors were fitted with Anti-Finger Trap stiles which were hung directly from the Comar 6EFT curtain walling.

All Comar approved fabricators are required to have the technical expertise to attend pre-site meetings and provide detailing.  Anglia Fixing Ltd liaised closely with the specifiers to provide design advice and detailing which ensured the project ran smoothly and met site deadlines.

Architects:                          Wincer Kievenaar

Fabricator:                          Anglia Fixing Ltd

Main Contractor:               SEH French

Project Value:                     £33K Metal

System Used:                     Comar 5P.i ECO (Top Hung), 6EFT (Capped) & 7P.i CD

Location:                             Sudbury, Suffolk

New Library & Supported Living for Local Community

seaford

Comar Architectural Aluminium Systems, with their approved fabricator Veranti Systems; recently completed the new Seaford Library complex in East Sussex.  This multi million pound project is part of the Sutton Park Road development for East Sussex County Council and Saxon Weald Homes and includes a library, cafe, supported living for adults with learning disabilities and adult day services for older people.

Copy of image001 Copy of image004

This mixed use project was completed using Comar 5P.i Tilt & Turn windows, Comar 6EFT Curtain Walling, Comar 7 Folding Sliding Doors and Comar 7P.i CD doors in both Pivot and Sliding configurations.  Comar 5Pi window system uses trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance in a market where energy efficient designs and meeting the demands of the latest building regulations are paramount.  From fifteen basic Comar 5Pi profiles, all window configurations, such as casement, top swing reversible, pivot, tilt and turn and sliding can be manufactured.

The architect’s design vision was to create a continuous wall of glass to the libraries ground floor facade. With this in mind, and to ensure the design brief could be achieved, Comar 6EFT was selected as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.

In a mixed use development both Comar 7 and Comar 7P.i CD systems are a natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically to be suitable for public and domestic applications.  The entrance doors to the library were also required to comply with the Disability & Equality Act 2010.

 

School Achieves Excellent BREEAM Rating & Shortlisted for ‘Construction Award’ 2015

SAMSUNG CAMERA PICTURES

Comar Architectural Aluminium Systems; with their approved fabricator Veranti Systems completed a new build 2 form entry Catholic Primary School in Poplar, East London. Formed out of a merger of two schools the bright and eye catching design uses brick to match the surrounding area and is wrapped with shards of colour in the form of Brise Soleil. The overhanging roof ensures extra shading; with the roof line being reminiscent of Poplar’s ship building past and the skyline of London’s Canary Wharf featuring as the backdrop.  Achieving a BREEAM rating of excellent the school has been shortlisted for a 2015 ‘Construction Award’.

Comar 5P.i. Top/ Side Hung and Fixed Light  thermally efficient polyamide insulated windows were specified. These aluminium windows offer outstanding weather performance and reduce heat loss through the trademark P.i thermal break ensuring low U-values so energy bills are minimised.

SAMSUNG CAMERA PICTURES  SAMSUNG CAMERA PICTURESSAMSUNG CAMERA PICTURES

Comar 6 curtain walling is a versatile thermally efficient system designed to integrate panels and glass of different widths into the façade with special profiles to include opening vents and doors.  The design of Comar 6 makes it ideal for complex facetted curtain walls as well as sheer glazed facades. Comar 6 was selected due to its slim 50mm profiles which maximised the glazed area for natural day lighting.

In a busy education environment, Comar 7 sets are a natural choice.  Not only are they available in swing, pivot, sliding, auto-sliding and sliding folding, they have been designed specifically for applications where high traffic solutions are required.  For safety, the Comar 7 doors were fitted with anti-finger trap stiles, Axim soft touch panic exit devices and Axim concealed transom closers which were hung directly from the Comar 6 frame and complied with the Disability & Equality Act 2010.

Architects: Green Tea Architects, SE London

Fabricator:  Veranti Systems, Hampshire

Main Contractor: 8 Build, London

System Used: Comar:  5P.i, 6, 7P.i CD & Ducosun Cubic 200/ 300

 

 

Comar Juxtaposition – Manchester

Ashton 6th Form College’s new reception was designed by the GA Studio, Manchester and is a featured  project in the 2015 Manchester Architectural Review.  Both Comar 6 EFT Curtain Walling and Comar 7 Auto Sliding Doors were specified for this eye catching project.

http://www.excelpublishing.co.uk/directories/Manchester-Architects/2015/#/1/